We provide comprehensive Principal Construction Work Designer (PCWD) services, fully aligned with industry regulations and best practices. The PCWD role was introduced in Malaysia under the Occupational Safety and Health (Construction Work) (Design and Management) Regulations 2024 (CDM Regulations 2024). Our services are designed to ensure full compliance with the requirements of the Regulations, supporting effective design risk management and safer construction outcomes.

Service include:

  • Full compliance with CWDM 2024 Regulation and OSCHIM 2017 Guideline
  • Compile and document Client Briefing
  • Review and verify Pre-Construction Information (PCI)
  • Conduct Design Management Review
  • Conduct Design Risk Assessment (DRA)
  • Conduct Qualitative Risk Assessments to ensure safe design practices
  • Prepare and maintain the Safety & Health File
  • Review and verify the Construction Phase Plan (CPP)
  • Monitor the Principal Contractor throughout the construction phase
  • Ensure safe project completion and formal handover of Safety & Health File

 

Project Reference (PCWD):

CADANGAN PEMBANGUNAN KOMPLEKS PERNIAGAAN BERCAMPUR 18 TINGKAT DAN SATU ARAS BASEMENT YANG MENGANDUNGI 271 UNIT BILIK HOTEL, PEJABAT, RESTAURANT, KAFE, BILIK FUNCTION, DEWAN BANQUET, KOLAM RENANG, GYM DAN KEMUDAHAN LAIN, DI ATAS LOT 2052N, LOT 2053N, LOT 2854N DAN LOT 3506N, JALAN SULTAN ABDUL JALIL, BANDAR IPOH (U), DAERAH KINTA, PERAK DARUL RIDZUAN UNTUK TETUAN ONE ROOF DEVELOPMENT SDN BHD.

CADANGAN MEMBINA SEBUAH LOJI RAWATAN AIR SISA INDUSTRI DI ATAS SEBAHAGIAN LOT 4878, MUKIM HUTAN MELINTANG, DAERAH BAGAN DATUK, PERAK DARUL RIDZUAN UNTUK TETUAN UNITATA BERHAD.

CADANGAN MEMBINA SEBUAH LOJI RAWATAN AIR SISA INDUSTRI DI ATAS SEBAHAGIAN LOT 11254, MUKIM HUTAN MELINTANG, DAERAH BAGAN DATUK, PERAK DARUL RIDZUAN UNTUK TETUAN UNITATA BERHAD.

CADANGAN MEMBINA 78 UNIT RUMAH TERES 1- TINGKAT (LOT 1675 – LOT1752) BANDAR KAMPAR DAN 13 UNIT RUMAH TERES 1 – TINGKAT (LOT 315264 – LOT 315276) MUKIM KAMPAR, DAERAH KAMPAR, PERAK UNTUK TETUAN LAKUNIAGA SDN BHD.

CADANGAN MEMBINA SEBUAH 66MW PUSAT DATA, MUKIM PULAI,JOHOR BAHRU, JOHOR DARUL TA’ZIM.

CADANGAN MEMBINA SEBUAH 72MW PUSAT DATA, MUKIM PULAI,JOHOR BAHRU, JOHOR DARUL TA’ZIM.

CADANGAN MEMBINA GUDANG FASA 2 YANG MENGANDUNGI: i . 1 UNIT GUDANG 1 TINGKAT ii. 1 UNIT RUANG BARANGAN SEKERAP DAN KEMUDAHAN KEMUDAHAN SOKONGAN DI ATAS LOT 386, JALAN PERUSAHAAN VALDOR, KAWAAN PERINDUSTRIAN VALDOR, MUKIM 12, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG UNTUK TETUAN PROTT SDN. BHD.

PROPOSED SMART WAREHOUSE (A.S.R.S.) AT PLOT I5, TAMAN PERDAGANGAN ELMINA, BANDAR ELMINA, MUKIM RAWANG, DAERAH GOMBAK, MAJLIS PERBANDARAN SELAYANG, SELANGOR DARUL EHSAN FOR PTT DEVELOPMENT SDN. BHD.

CADANGAN MEMBINA: i. 1 UNIT GUDANG 1 TINGKAT BERSERTA PEJABAT ARAS ‘MEZZANINE’, ii. 1 UNIT PENCAWANG PADAT, iii. 1 UNIT PONDOK PENGAWAL, iv. 1 UNIT KEBUK SAMPAH, PLOT 2; i. 1 UNIT GUDANG 1 TINGKAT BERSERTA PEJABAT ARAS ‘MEZZANINE’, ii. 1 UNIT PENCAWANG PADAT, iii. 1 UNIT PONDOK PENGAWAL iv. 1 UNIT KEBUK SAMPAH, PLOT 3; i. 1 UNIT GUDANG 1 TINGKAT BERSERTA PEJABAT ARAS ‘MEZZANINE’, ii. 1 UNIT PENCAWANG PADAT, iii. 1 UNIT PONDOK PENGAWAL, iv. 1 UNIT KEBUK SAMPAH, PLOT 4; i. 1 UNIT GUDANG 1 TINGKAT BERSERTA PEJABAT ARAS ‘MEZZANINE’, ii. 1 UNIT PENCAWANG PADAT, iii. 1 UNIT PONDOK PENGAWAL, iv. 1 UNIT KEBUK SAMPAH, PLOT 5; i. 1 UNIT GUDANG 1 TINGKAT BERSERTA PEJABAT ARAS ‘MEZZANINE’, ii. 1 UNIT PENCAWANG PADAT, iii. 1 UNIT PONDOK PENGAWAL, iv. 1 UNIT KEBUK SAMPAH PTD 16172 HINGGA PTD 16191, MUKIM JERAM BATU, DAERAH PONTIAN, JOHOR DARUL TA’ZIM UNTUK TETUAN PTT DEVELOPMENT SDN. BHD.

CADANGAN PEMBANGUNAN KOMPLEKS PEMBUATAN “SOLAR INVERTER” YANG MENGANDUNGI:- A) 1 UNIT PONDOK PENGAWAL B) 1 UNIT KILANG 2 TINGKAT (90M X 270M) C) 1 UNIT 33KV PENCAWANG ELEKTRIK D) 1 UNIT RUMAH PAM E) 1 UNIT TANGKI SIMPANAN AIR DOMESTIK F) 1 UNIT SIMPANAN AIR BOMBA G) 1 UNIT RUMAH SAMPAH DI ATAS PTD 199898 DAN PTD 199899, ECO BUSINESS PARK 2, MUKIM TEBRAU,DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM UNTUK TETUAN DEYE NEW ENERGY TECHNOLOGY (MALAYSIA) SDN. BHD.

CADANGAN MEMBINA BANGUNAN PERINDUSTRIAN SESEBUAH YANG MENGANDUNGI: 1 UNIT GUDANG (AUTOMATED STORAGE AND RETRIEVAL SYSTEM-ASRS) 1 TINGKAT BESERTA TINGKAT MEZZANIN DAN PEJABAT 3 TINGKAT, 2 UNIT BANGUNAN MEKANIKAL DAN ELEKTRIKAL 2 TINGKAT, 2 UNIT PONDOK PENGAWAL, 2 UNIT RUMAH SAMPAH, 1 UNIT PENCAWANG ELEKTRIK, 1 UNIT BANGUNAN TEMPAT LETAK KENDERAAN 5 TINGKAT, TEMPAT MELETAK KONTENA SEMENTARA DI ATAS LOT PT 165101 HINGGA PT 165120, JALAN LANSARAN 2/KU 5, BANDAR BUKIT RAJA, KAPAR, MUKIM KAPAR, DEARAH KLANG, SELANGOR UNTUK TETUAN PTT SYNEXIS SDN. BHD

 

Perkhidmatan Pereka Bentuk Prinsipal Kerja Pembinaan (PCWD)

Kami menyediakan perkhidmatan Pereka Bentuk Prinsipal Kerja Pembinaan (PCWD) yang menyeluruh dan selaras sepenuhnya dengan peraturan industri serta amalan terbaik. Peranan Pereka Bentuk Prinsipal Kerja Pembinaan telah diperkenalkan di Malaysia melalui Peraturan-Peraturan Keselamatan dan Kesihatan Pekerjaan (Kerja Pembinaan) (Rekabentuk dan Pengurusan) 2024. Peranan dan perkhidmatan kami adalah selaras dengan akta ini.

Skop Perkhidmatan Kami:

  • Pematuhan penuh terhadap Peraturan CWDM 2024 dan Garis Panduan OSCHIM 2017
  • Menyediakan dan mendokumentasikan Taklimat Klien (Client Briefing)
  • Menyemak dan mengesahkan Maklumat Pra-Pembinaan (PCI)
  • Melaksanakan Semakan Pengurusan Reka Bentuk (Design Management Review)
  • Melaksanakan Penilaian Risiko Reka Bentuk (DRA)
  • Menjalankan Penilaian Risiko Kualitatif untuk memastikan amalan reka bentuk yang selamat
  • Menyediakan dan menyelenggara Fail Keselamatan & Kesihatan
  • Menyemak dan mengesahkan Pelan Fasa Pembinaan (CPP)
  • Memantau Kontraktor Prinsipal sepanjang fasa pembinaan
  • Memastikan projek siap dengan selamat dan penyerahan rasmi Fail Keselamatan & Kesihatan